Fast-guard™ RN 500FR

Jump To:

Single pack, water-based, acrylic coating.

Fast-guard™ RN 500LR is a solvent-free, water-based, acrylic coating specfically designed as a topcoat for cementitious fire protection.

 

Primary Features:

  • Solvent-free (low odour), water-based, acrylic topcoat
  • Very high flexibility and crack bridging properties
  • Designed as a topcoat for cementitious fire protection systems
  • The main advantage of the system is its ability to be applied on freshly applied fire protection, hence reducing the downtime
  • No overcoating limitations
  • Allows controlled drying out of the substrate
  • Offers excellent protection against the elements and UV attack

 


Data Sheets

Below are the relevant data sheets relating to RN 500FR. Items with a padlock require you to log into your account.

RN 500FR's Properties

Jump To:
Primary duties Topcoat for cementitious fire protection
Primary characteristics Allows substrate to dry. Fire retardant
Solvent-free
Wet-tolerant  
Rust-tolerant  
Glassflake  
Low/No odour
Maximum humidity 70%
Volume solids 52%
UV resistant
Maximum immersed temperature °C
Maximum non-immersed temperature °C
Minimum time to touch dry 1.5 hrs
Maximum overcoat time Unlimited
Typical dry film thickness (dft) per coat 52-104µ
Colour range available Full range of colours is available

RN 500FR's Case Histories

Jump To:

The table below shows the 5 most recent case histories for this product. You can view the entire case history for this product by clicking here.

Company Location Job Description Industry Date of Job
Cape Industrial Services UK Structural Coating Industrial 06/2018
Cape Industrial Services UK Structural Coating Industrial 06/2018
Aaronite Italia Italy Structural Coating (Fire Retardant Topcoat) Petrochemical 04/2018
Torishima Service Solutions Glasgow, Scotland Structural Repair Industrial 03/2018
Torishima Service Solutions Glasgow, Scotland Structural Repair Industrial 03/2018

RN 500FR's Related Case Studies

Jump To:

The table below shows the most recent case studies for this product.

Company/Industry Location Date of Job
Roof Refurbishment - Henry Park Primary School Singapore 06-2014